Magnetic Mini GPS Tracker with Real-Time Location, Movement Alerts and Audio Monitoring

Magnetic Mini GPS Tracker with Real-Time Location, Movement Alerts and Audio Monitoring

£29.99
Sale price  £29.99 Regular price  £42.90
Skip to product information
Magnetic Mini GPS Tracker with Real-Time Location, Movement Alerts and Audio Monitoring
4.89 / 5
Based on 2,571 reviews
Almost sold out

Magnetic Mini GPS Tracker with Real-Time Location, Movement Alerts and Audio Monitoring

£29.99
Sale price  £29.99 Regular price  £42.90
30-Day Guarantee – Try It Risk-Free
100% Secure Payments
Payment methods
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • JCB
  • Mastercard
  • Visa
J. Taylor

Quick delivery and really well packed – nothing rattling around in the box. Good quality for the price. Already thinking about ordering another one.

J. Taylor
Fast delivery with Royal Mail Free delivery
  • Packed within 24h and sent anywhere in the UK
  • Real-time parcel tracking
  • Insurance included — theft and damage
Dispatched in 24H – Free Delivery

Our products are ready to be part of your everyday life from the very first moment.

Free Shipping Across UK

Wherever you live — in the city or in rural areas — we ship at no extra cost. A simple, fast shopping experience with no surprises.

Guaranteed Reliability and Speed

We know your time is precious. That's why we process and dispatch every order in under 24 hours, with clear, up-to-date tracking all the way to delivery.

30-Day Guarantee – Try It Risk-Free

Shop with Complete Peace of Mind thanks to our 30-Day Guarantee

We have full confidence in the quality and effectiveness of our products. That's why we give you 30 days to try them at home, with no obligation and complete peace of mind.

Your Satisfaction is Our Priority

If you have a problem, a question, or need assistance, our customer support team is always at your disposal. We want your experience to be simple, fast and completely satisfying, from the first click right through to delivery.

Never Lose What Matters Most

A stolen car. Lost luggage. A missing pet. That sinking feeling when you realise something precious is gone.
This tracker puts you back in control. With real-time GPS tracking on your smartphone, you always know exactly where your belongings are, right away.

Magnetic Mini GPS Tracker with Real-Time Location, Movement Alerts and Audio Monitoring

Why This Tracker Keeps You Protected:

Live GPS Tracking
Real-time location updates sent straight to your phone. See where your vehicle, luggage, or valuables are, anytime and anywhere.

Instant Movement Alerts
Receive a notification the moment a tracked item starts moving. Great for preventing theft or keeping watch over what matters whilst you are away.

Audio Monitoring Feature
Listen in remotely using the built-in audio function. Extra peace of mind when you need to know what is going on.

Powerful Magnetic Mount
Snaps firmly onto any metal surface in seconds. No drilling, no installation, no hassle.

Long-Lasting Battery
A dependable lithium coin cell battery keeps running when you need it most. Set it up and forget about it.

All-Weather Resistant
Operates in extreme temperatures from −20°C to 70°C. Rain, snow or heat, it keeps on tracking.

Magnetic Mini GPS Tracker with Real-Time Location, Movement Alerts and Audio Monitoring

Perfect for Protecting:

  • Vehicles
    Help prevent car theft with instant alerts.
  • Luggage and bags
    Never lose your belongings whilst travelling again.
  • Valuable equipment
    Keep your expensive tools and gear safe.
  • Bikes and motorcycles
    Locate your ride if it ever goes missing.
  • Elderly family members
    Enjoy peace of mind knowing your loved ones are safe.
  • Pets
    Always know where your four-legged companion has wandered off to.

Magnetic Mini GPS Tracker with Real-Time Location, Movement Alerts and Audio Monitoring

What You Get:

Each tracker includes:

  • Magnetic GPS tracker with live location features
  • Full control via smartphone app (iOS and Android)
  • Real-time movement alerts
  • Audio monitoring functionality
  • Simple setup in minutes

Technical Specifications:

  • Material: Durable ABS plastic
  • Dimensions: 4.1 cm × 1.4 cm (ultra-compact)
  • Frequency: 850/900/1800/1900 MHz
  • Operating range: −20°C to +70°C
  • Power: 3V lithium coin cell battery

⚡︎ Last chance! Boneroshop + offer ⚡︎

Shop with confidence

You're 100% protected by our purchase guarantee

  • 30-day guaranteeTry it risk-free
  • Easy returnsOn every order
  • Customer supportQuick, friendly replies
  • Tracked deliveryFree across the UK
  • 100% secure paymentEncrypted SSL connection

Frequently asked questions

Do you offer free shipping?

Yes. Standard delivery is free on all UK orders, no minimum spend
required. We currently ship to UK addresses only (England, Scotland,
Wales, Northern Ireland).

How long does delivery take?

Orders are typically processed within 1–2 business days and delivered
within 6–9 business days after dispatch. Orders placed before 1:00 PM
UK time on a business day begin processing the same day; orders placed
later or over the weekend begin processing the next business day.

How can I track my order?

Once your order has been dispatched, we'll email you a tracking link
from our shipping partner (Royal Mail, DPD, or Evri depending on your
delivery address). You can also track orders directly in your customer
account on boneroshop.com.

What is your return policy?

We offer a 30-day return window from the date you receive your order.
Items must be in original condition, and returned with original
packaging. Under UK consumer law (Consumer Contracts Regulations 2013),
you also have a statutory 14-day cancellation right. Full details are
on our Refund Policy page.

What payment methods do you accept?

We accept all major payment methods through Shopify Payments: Visa,
Mastercard, Maestro, American Express, Discover, Diners Club, and
UnionPay. We also accept Apple Pay, Google Pay, and Shop Pay. For
buy-now-pay-later, we offer Klarna and Shop Pay Installments at checkout,
subject to eligibility.

Is checkout secure?

Yes. Our entire store runs on HTTPS with SSL encryption, and payments
are processed by Shopify Payments, which is PCI-DSS Level 1 compliant —
the highest security standard in the payments industry. We never see,
store, or have access to your full card details.

What should I do if I receive a damaged or incorrect item?

We're sorry that happened. Please email us at support@boneroshop.com
within 48 hours of delivery with your order number and clear photos
of the issue. We'll arrange a free return and either a replacement or
a full refund — whichever you prefer.

Can I cancel my order?

If your order has not yet been dispatched, we can usually cancel it for
a full refund — email us at support@boneroshop.com as soon as possible.
Once an order has been dispatched, it can't be cancelled, but you can
return it under our standard 30-day return policy after delivery.

How can I contact customer support?

You can reach us at support@boneroshop.com or by phone on +44 20 8040 0104, Monday to Friday, 9:00 AM – 5:00 PM UK time. We're a small UK
team — you'll always hear from a real person, usually within one
business day.